• Material: PEHD-PE80
• Standard: EN13476 (DIN 16961)
• Pipes can be buried at the depth of min 0,8m-8m max. Bellow 0,8m it is necessary to
protect the pipe with concrete
• Max. load 18t/base
• Ring hardness SN=4KN/m2 or SN=4(KPa)
• Standard length 6 and 12m
• Standard color – BLACK *It is possible to change the color on buyers request
OTHER PREFERENCES
It is possible to connect the pipes with the socket with rubber bend, which is inserted into the third channel of corrugated pipes between ribs, after that greased socket is inserted over the rubber bend onto the pipe. Pipes can be cut down with ordinary or saw. All parts of the pipes can be used by putting them together. PEHD pipes are lighter than PVC pipes intended for the same purpose, which makes it easier to manipulate and install them. They are highly resistant to aggressive chemical environment and the surrounding ground. It is possible to lay and use PEHD pipe lines at temperature range from -40°C up to +60°C. Smooth inner surface has a low coefficient of friction; which is why these pipes have very good hydraulic characteristics. They are highly resistant to abrasions. They have excellent mechanical and physical features.
Pipes are resistant to UV radiation, and they can be stored outside for period of one year, for longer periods they should be protected. It is necessary to make sure that while transporting and placing the pipes they are not to be dragged over sharp edges, because they can be damaged. On the other hand, these pipes are highly resistant to impact with dull objects. Pipes are certified by the Institute for raw materials of Republic of Serbia.

| CODE | Spoljni prečnik (mm) | Unutrašnji prečnik (mm) | |
|---|---|---|---|
| 10700000 | 110 | 92 | |
| 10700001 | 125 | 108 | |
| 10700002 | 160 | 138 | |
| 10700003 | 200 | 176 | |
| 10700004 | 250 | 213 | |
| 10700005 | 315 | 271 |
PIPE INSTALLATION
Pipes must be build in an expert way, by following the direction for placing the pipes according to the EN 1610 and DIN 4033, which means that in an area of the pipe line from the bottom of the trench up to at least 30cm above the pipe top, the following compression values should be reached: According to PROCTOR
• 97% density of the dug up ground for the unbendable ground
• 95% density of the dug up ground for the bondable ground
all compression values should be proven during handling